What inverter information do you need?

The specific inverter details the DNO looks for, and what to do if your inverter isn't on the standard list.

Written by the DNO Renewables teamUpdated

The DNO wants enough inverter information to confirm the equipment is type-tested and compliant with G98 or G99.

What we need

For each inverter:

  • Manufacturer
  • Model
  • Rated AC output (kW or kVA)
  • Rated AC current per phase
  • Type-test certificate confirming G98 or G99 compliance (either the certificate itself, or enough model information for us to locate it on the ENA type-test register)

For battery inverters (or hybrid units acting as battery inverters), we also need:

  • Battery capacity (kWh)
  • Battery inverter mode of operation (self-consumption, grid-tied only, backup, etc.)

Where to find it

  • On the inverter's datasheet from the manufacturer's website.
  • On the label on the side or underside of the unit itself (once installed).
  • From your solar design software if it's already been specified.

A good datasheet PDF is worth more than a screenshot of one page.

What if my inverter isn't on the standard list?

If the inverter isn't on the ENA type-test register:

  • Check with the manufacturer directly. Many have compliant models that aren't universally listed.
  • If it genuinely isn't type-tested, the DNO will likely reject the application. Substituting a type-tested equivalent is usually the fastest fix.
  • Send us a message on the application before submitting. We can help identify a compliant alternative that fits the design.