A DNO notification for qualifying small-scale generation.
G98 covers grid-connected generation up to 3.68 kW per phase (16 A single-phase or 48 A three-phase). Unlike G99, it's notified after commissioning, so the installation can be completed first.
Solar PV up to 3.68 kW / phase
Standard domestic rooftop installations, single-phase or three-phase.
Solar plus battery
Where the combined generation stays within the G98 limit and export limitation applies.
Battery storage only
Standalone battery installations that qualify under G98 when export is limited.
Which route applies to your install?
Pick the wrong route on submission and the whole thing bounces back. Here's the distinction in plain terms.
G98 notification
- Up to 3.68 kW / phase
- Submitted after commissioning
- 1 to 5 working days typical
- From £50 + VAT
G99 application
- Above 3.68 kW / phase
- Approved before install
- 4 to 12 weeks by DNO
- From £125 + VAT
Everything covered for a fixed £50 + VAT.
No hidden costs on our side. DNO fees, where applicable, are forwarded at cost.
Four steps from details to confirmation.
Send us the details
Address, MPAN, phase, equipment. Takes 3 minutes in the portal.
We prepare and submit
Correct DNO, correct form, correct supporting documents.
DNO correspondence
Every reply lands in your portal instantly, no email chains.
Confirmation stored
Submission confirmation kept on your project record forever.