G98 Notification Service

G98 Notifications, Handled.

Send us your installation details and we'll prepare and submit the G98 notification to the relevant DNO on your behalf.

£50+ VAT per notification
Every UK DNO UK-Based Team Installer Portal Fixed Price
The basics

What is a G98 notification?

G98 is the notification process used for qualifying small-scale generation connected in parallel with the electricity network. Unlike G99 applications, qualifying G98 installations can generally be installed and commissioned before the DNO is notified, with the notification then submitted within the required timeframe.

For a typical single-phase installation, G98 generally applies where generation capacity is no more than 3.68 kW (16 A) per phase, subject to the system configuration and applicable requirements.

G98 is a notification, not an approval. We use terms like "notification submitted" and "DNO acknowledgement", rather than "G98 approval".

G98 vs G99

Not sure which one you need?

Different processes, different timings, different costs. Here's the short version.

FeatureG98 NotificationG99 Application
Typical useSmall-scale generationLarger generation
Typical single-phase thresholdUp to 3.68 kW / phaseAbove G98 limits / other applicable configurations
DNO processNotificationApplication / assessment
Before installation?Generally no pre-approvalNormally requires DNO process before connection
DNO Renewables price£50 + VATFrom £125 + VAT

Still unsure? Send us the project details and we'll determine the correct route. About G99 Applications

What G98 covers

G98 notifications for small-scale generation.

EV chargers and standalone heat pumps are demand connections, not G98 generators. We handle those separately.

Solar PV

Straightforward small-scale PV installations within the applicable G98 limits.

Solar + Battery

Where the system configuration remains eligible for the relevant G98 route.

Battery Storage

Qualifying small-scale battery / inverter arrangements.

Not sure whether your battery configuration qualifies for G98? Send us the system details and we'll establish the appropriate route.

Adding a battery?

3.68 kW export limit ≠ automatically G98.

The correct DNO route depends on the inverter arrangement, existing generation and overall system configuration, not simply the proposed export limit.

Send us the existing system and proposed battery details. We'll determine whether G98, G99 or another relevant route applies.

Adding to an existing installation?

We'll review the change.

  • Battery being added
  • Additional panels
  • Changing the inverter
  • Adding another inverter

Send us the existing DNO documentation and proposed equipment details. We'll review the change and establish what needs to be notified or applied for.

What we'll need

Complete our simple Project Information Form.

We'll use the information to prepare the DNO notification for you. G98 is normally submitted after the installation has been commissioned, so we'll need the completed installation details before preparing the notification.

  • Installation address
  • Customer details
  • MPAN
  • Supply phase
  • Inverter make / model
  • Inverter capacity
  • Generation technology
  • Installed generation capacity
  • Commissioning date
  • MCS details where relevant
  • Installer details
  • Supporting equipment information where required
How it works

What happens after we submit.

Once we have the required information, we'll prepare and submit the notification promptly. Anything the DNO comes back with is handled by us.

01

Notification submitted

We prepare and send the completed notification to the relevant DNO.

02

Reference / acknowledgement

Any DNO reference or acknowledgement is recorded against the project.

03

Queries

If the DNO asks for further information, we manage the correspondence.

04

Documentation

Relevant confirmation is uploaded to your portal and kept with the project.

Fixed price

£50

+ VAT per notification

What the fee covers

  • Preparation of the notification
  • Submission to the relevant DNO
  • Supporting documentation
  • Portal record of the project
  • DNO correspondence relating to the notification
  • Confirmation / documentation uploaded when received

£50 + VAT covers DNO Renewables' service. Any charges imposed separately by the network operator or third parties are not included.

Portal

Everything kept with the project.

Your submission, documents, DNO correspondence and confirmation stay together in your DNO Renewables portal, so you don't have to hunt through emails months later when a customer asks for their paperwork.

Missed a notification?

Already installed but the G98 wasn't submitted?

If you've taken over a project or discovered that a previous installation hasn't been notified correctly, send us the information you have and we'll review what is required.

Ask Us to Review It
Other ways to work with us

Prefer to do it yourself, or do a lot of them?

Prefer to submit G98s yourself?

Use our DNO CRM for free. Manage your own G98 and G99 projects in one place and hand individual applications to DNO Renewables whenever you need support.

Try the Free CRM

Too many notifications to manage internally?

For installers handling regular or high-volume DNO workloads, we offer managed and bulk application services with dedicated workflows and volume pricing.

View Bulk DNO Management
FAQs

G98 questions, answered.

Ready to submit a G98?

Send us the installation details. For £50 + VAT, we'll take care of the notification.