EV Charger DNO Applications

EV Charger DNO Applications, Handled.

We manage the DNO connection process for EV charger installations across the UK, from domestic chargers to commercial and fleet charging infrastructure.

Every UK DNO UK-Based Team Installer Portal Managed End-to-End
Why the DNO

EV chargers are a Low Carbon Technology connection.

Under the ENA's LCT process, every charging installation needs to be either notified or formally applied for. Which route depends on the charger, the supply and the wider site load.

01

New continuous load

EV chargers add sustained demand that the local network must be able to support alongside existing loads.

02

LCT connection process

Charging equipment falls under the ENA's Low Carbon Technology process, either notified or applied for.

03

Load management counts

Where load management is in place, we capture the operating logic so the DNO sees the real maximum demand.

The two routes

Connect & Notify or Apply to Connect?

A 7 kW charger doesn't automatically qualify. The DNO looks at the whole picture. We confirm the right route before submission.

Connect & Notify

  • Qualifying charger and site conditions
  • Adequate cut-out and supply
  • Install proceeds, DNO notified
  • Typically faster turnaround

Apply to Connect

  • Commercial, fleet or rapid chargers
  • Constrained cut-out or supply
  • DNO approval required first
  • Timescales vary by DNO
What's included

Everything we handle on your EV submission.

Route confirmation (Connect & Notify vs Apply to Connect)
Cut-out and supply capacity review
Load-management documentation where applicable
Application preparation and submission
DNO liaison and correspondence handled
Combined submissions with heat pumps where applicable
Who it's for

From single home chargers to depot electrification.

Domestic chargers

Single and dual 7 kW installs, including three-phase where cut-out allows.

Commercial and workplace

Multi-charger sites, offices, retail and destination charging up to hub scale.

Fleet and depot

Depot electrification, 22 kW+ chargers, DC and rapid charging schemes with load balancing.

How it works

Four steps from details to decision.

STEP 01

Send us the details

Address, MPAN, phase, cut-out, charger model and quantity. 3 minutes in the portal.

STEP 02

We confirm the route

Connect & Notify or Apply to Connect, based on the whole electrical picture.

STEP 03

Submitted and monitored

We submit under our own credentials and chase the DNO if response is slow.

STEP 04

Decision delivered

Approval or DNO requirements come back into your portal in real time.

FAQs

EV charger DNO questions, answered.

Take the DNO work off your team.

Whether you're installing one charger or delivering EV infrastructure across multiple sites, we'll manage the DNO connection process so your team can concentrate on the installation.