What is a Grid Connection Feasibility Study?

When to request a feasibility study before committing to a full DNO application, and what it tells you.

Written by the DNO Renewables teamUpdated

A Grid Connection Feasibility Study is an early-stage investigation into whether the local network can support a proposed generation or import project, before you commit to a formal DNO application.

When to request one

A feasibility study is worth considering when:

  • Project size is commercial or utility-scale (typically above ~500 kW, always above ~1 MW).
  • Site location suggests network constraint (rural, remote, or a known constrained area).
  • The customer wants to understand cost and viability before committing.
  • You're evaluating multiple potential sites and want to compare grid outcomes.
  • Battery storage, EV charging hubs or large loads are involved and the import headroom is uncertain.

When you don't need one

For a straightforward domestic G98 or small G99 application, a feasibility study is normally unnecessary. Just apply.

What the study covers

  • Available network capacity at the point of connection.
  • Likely reinforcement requirements (if any).
  • An indicative connection cost band from the DNO.
  • Timescale expectations.

What it doesn't do

  • A feasibility study doesn't guarantee capacity. Network conditions change and formal offers can differ.
  • It doesn't include the DNO's own application fees. Those are separate.

What happens after the study

If the study confirms the project is viable, you can progress to a formal application with a much clearer picture of what to expect. If it identifies a problem — insufficient capacity, expensive reinforcement, long timescales — you know before spending on a full submission.