Two terms that sound the same but mean opposite things. Here is a plain English explainer.

Written by the DNO Renewables teamUpdated

The one-line version

  • Import = electricity flowing from the grid to the property (using electricity)
  • Export = electricity flowing from the property to the grid (selling solar back)

Why installers mix these up

Because the DNO cares about both, and the paperwork lists them separately.

When each matters

Import capacity matters when

  • You're installing EV chargers, heat pumps, or big loads
  • The customer wants to upgrade their supply from 60A to 100A (a "supply upgrade")
  • You're on a fuse that would blow with the added load

Export capacity matters when

  • You're installing solar, wind, or battery with export
  • The customer wants to feed back to the grid
  • You're applying for a Smart Export Guarantee tariff

Typical numbers

PropertyImport (typical)Export requested (typical)
UK domestic house60A or 80A single phase3.68 kW to 5 kW
Large domestic100A single phaseUp to 16 A single phase
Small commercial3-phase 100ADepends on system
Large commercial3-phase 200A+30 kW+

On the DNO application

You'll be asked for both:

  • Existing import capacity (from the customer's cut-out or fuse rating)
  • Requested export capacity (usually the inverter's AC rating, or lower if export-limiting)

[!TIP] A customer with an EV charger and solar is asking the DNO for both an import capacity confirmation and an export approval at once. That's normal and it's still one G99 application.